GE CT ProSpeed Series Installation Manual page 12

Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 1
GANTRY AND TABLE INSTALLATION ANS LEVELING (Tab 2)
SYSTEM POWER, GROUND AND CABLE INTER-CONNECTION (Tab 4)
GENERAL SYSTEM CABLING INSTRUCTIONS AND REFERENCE
SCAN ROOM X-RAY ON LIGHT AND SYSTEM POWER ON LIGHT
TYPICAL INSTALLATION AND CHECK/ADJUSTMENT PROCEDURE (Tab 8)
CONTENTS
SITE PREPARATION FOR INSTALLATION (Tab 1)
SITE PREPARATION
REQUIRED TOOLS AND TEST EQUIPMENT CHECK
FLOOR AND ROOM PREPARATION
INSTALLATION AND LEVELING OF GANTRY
INSTALLATION AND LEVELING OF TABLE
INSTALLING OF REMAINING COMPONENTS (Tab 3)
POWER DISTRIBUTION UNIT (PDU)
OPERATOR CONSOLE (Qj-b TYPE)
OPERATOR CONSOLE (Zj/Zj-a TYPE)
OPTION BOARD LOCATIONS
MOD INSTALLATION
LASER IMAGER INSTALLATION
DIAGNOSTIC CONSOLE
CABLE INTER-CONNECTION (Qj)
SCAN ROOM DOOR SAFETY
CABLE INTER-CONNECTION (Zj)
SCAN ROOM X-RAY ON LIGHT
ANCHORING OF GANTRY AND TABLE (Tab 5)
PRECAUTION
ANCHORING
INSTALLATION COMPLETION (Tab 6)
INSTALLATION OF SUBSYSTEM TRIM COVER PANELS
DATA PLATE AND LABEL (Qj/Qj-b TYPE)
DATA PLATE AND LABEL (Zj/Zj-a TYPE)
OC EMBLEM
GANTRY EMBLEM
FINAL ROOM CLEAN-UP
SYSTEM COMPONENT IDENTIFICATION (Tab 7)
COMPONENT IDENTIFICATION
GENERAL
PROCEDURE ITEMS
APPENDIX
Symbols and Classification
CT PROSPEED SERIES INSTALLATION
ii
2124011

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents