4. Test the Project in Equinox Development Suite (Target System connected)
•
Launch the Project in Equinox Development Suite
•
With your Target System CONNECTED, place a Volt Meter across the Target Vcc and
GROUND terminals of the programmer (on the I/O Connector Module)
•
Click the <Power Up> button in EDS
illuminate
•
If the programmer reports an error on the LCD and the RED LED is flashing,
•
Measure the voltage across the Target Vcc and GROUND terminals of the programmer.
•
If required, measure the voltage across the Target_Vcc and GROUND on the actual
Target System
PPM3 MKII Programmer - User Guide - V1.04 - 10
the programmer <BUSY> LED should now
th
May 2008
67