Mandik FDMA PM Manual page 74

Fire damper
Hide thumbs Also See for FDMA PM:
Table of Contents

Advertisement

Installation frame E6 is suitable for:
● Installation outside solid wall/ceiling construction with cement lime plates
On the inside is installation frame equipped by intumescent sealing. It enlarges its capacity and air
proofs the gap between installation frame and damper body.
● Installation frame:
● Fasteners:
+3
● a x b = (A + 105
≥ 100
Screw
(min. 4x80)
Screw
20
(min. 4x80)
20
≤ 300
≤ 300
POSITION:
1
Damper with installation frame E6
2
Cement lime plates min. thickness 40 mm
(min. density 450 kg/m )
3
Cement lime prisms min. thickness 40 mm
3
(min. density 450 kg/m )
* min. 110 - Concrete/ min. 125 - Aerated concrete
cement lime plates
galvanized plate
+3
mm) x (B + 105
mm)
80
40
≤ 300
20
≤ 300
40
40
Screw
(min. 4x80)
40
≤ 300
≤ 300
Screws has to be fixed in wall/ceiling con-
struction. (If it is needed use steel bracket).
150*
≤ 300
≤ 300
40
20
Screw
20
(min. 4x80)
20
≤ 300
≤ 300
74
Screw
(min. 4x80)
Screw
40
(min. 4x80)
40
≤ 300
≤ 300

Advertisement

Table of Contents
loading

Table of Contents