Mandik FDMA PM Manual page 70

Fire damper
Hide thumbs Also See for FDMA PM:
Table of Contents

Advertisement

Installation frame E2 is suitable for:
● Solid wall construction
● Solid ceiling construction
Damper is on the body equipped by intumescent sealing. It enlarges its capacity and air proofs the gap
between damper body and steel cartridge.
● Gypsum wall construction has to be installed according manufacture requirements.
● Installation frame:
● Fasteners:
+3
● a x b = (A + 100
≥ 100
POSITION:
1
Fire damper FDMA PM
2
Installation frame E2
3
Mortar or gypsum
4
Holder with bolt
cement lime plates and galvanized plate
galvanized plate
+3
mm) x (B + 100
mm)
>100
150*
* min. 110 - Concrete/ min. 125 - Aerated concrete
70

Advertisement

Table of Contents
loading

Table of Contents