Mandik FDMA PM Manual page 72

Fire damper
Hide thumbs Also See for FDMA PM:
Table of Contents

Advertisement

Installation frame E4 is suitable for:
● Instalaci on solid wall/ceiling construction
● Installation on gypsum wall construction
● Instalaci outside solid ceiling constructions with concrete
On the inside is installation frame equipped by intumescent sealing. It enlarges its capacity and air
proofs the gap between installation frame and damper body.
● Gypsum wall construction has to be installed according manufacture requirements.
● Installation frame:
● Fasteners:
+3
● a x b = (A + 5
mm) x (B + 5
+3
● a x b = (A + 100
≥ 100
150*
cement lime plates
galvanized plate
+3
mm)
+3
mm) x (B + 100
mm) installation with concrete
max. 750
≥ 100
150*
max. 100
* min. 110 - Concrete/ min. 125 - Aerated concrete
POSITION:
1
Fire damper FDMA PM with installation frame E4
2
Fitting with threaded rods or steel bracket
3
Concrete B20
4
Rebar
72
Installation opening has to be
reinforced by profile (UW, CW).
Profil is fixed by screws ≥3,5 mm
with corresponding length. Distance
between screws ≤200 mm.

Advertisement

Table of Contents
loading

Table of Contents