Huawei SmartLogger3000 User Manual page 131

Hide thumbs Also See for SmartLogger3000:
Table of Contents

Advertisement

SmartLogger3000
User Manual
Parameter
Switch-off state feedback
port
Switch-on state feedback
port
Step 2 Verify that the SmartLogger can remotely turn on and off circuit breakers in scenarios with
circuit breakers.
----End
Remote Output Control
Step 1 Synchronize the clock source of the server.
Path
Settings > User
Param. >
Date&Time
Step 2 Set remote output control parameters.
Path
Settings > Active
Power Control
Issue 03 (2020-01-10)
Click Switch off and check that the circuit breaker is switched off properly.
Click Switch on and check that the circuit breaker is switched on properly.
Parameter
Clock source
Server
NTP
synchronization
test
Parameter
Active power
control mode
Control area
Output control
duration
PV plant ID
Remote output
control server
Copyright © Huawei Technologies Co., Ltd.
Description
Set this parameter to the DI port that reports the switch-off
status.
Set this parameter to the DI port that reports the switch-on
status.
Description
Set this parameter to NTP.
Set this parameter to the IP address or domain
name of the server for time synchronization.
You can click this button to check the time
synchronization status.
Description
Set this parameter to Remote output control.
Set this parameter to the area where the
remote output control function is used. To
enable the function in some areas, the license
needs to be imported and enabled.
Set this parameter to the time required for the
solar inverter to change its output power from
0% to 100% or from 100% to 0%.
Set this parameter to the PV plant ID.
Set this parameter to the IP address or domain
name of the server.
6 WebUI Operations
123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents