Hot-Swap Power Supply Installation - Lenovo ThinkAgile CP Hardware Part Replacement And Component Maintenance Procedures

Table of Contents

Advertisement

Step 3.
Close the handle.
Figure 25. Hot-swap power supply installation (2/2)
The installation of a hot-swap power supply is now complete.
After installing the power supply:
• Connect one end of the power cord to the new power supply connector. Then, connect the other end of
the power cord into a properly grounded electrical outlet.
• Ensure that the power supply LED is lit, indicating that the power supply is operating properly.
.
Chapter 5
Part replacement and maintenance procedures
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile cp4000Thinkagile cp6000

Table of Contents