Lenovo ThinkAgile CP Hardware Part Replacement And Component Maintenance Procedures page 81

Table of Contents

Advertisement

Notes:
• The electromagnetic interference (EMI) integrity and cooling of the storage are protected by
having all bays covered or occupied. When replacing a storage controller, minimize the amount
of time of the empty bay to avoid overheating or abnormal operation.
• The storage controller on the upper bay is upside down. Ensure that the storage controller is in
the right position (the release latch is on top) before installing.
ThinkAgile Advantage Support performs the following step:
Step 3.
ThinkAgile Advantage Support updates the VPD to maintain SN/UUID for entitlement. See "Update
the storage node VPD" on page 74.
The solution administrator performs the following steps:
Step 4.
Sign in to the primary interconnect with Chapter 4 "Support Mode" on page 23. For the username
enter admin and enter the password set during the solution deployment.
Step 5.
Run the following command on the primary interconnect:
> > s s u u d d o o s s e e r r v v i i c c e e t t a a c c p p - - n n e e t t w w o o r r k k - - c c o o n n t t r r o o l l l l e e r r r r e e s s t t a a r r t t
Step 6.
In the Cloud Controller dashboard, select Hardware from the left menu.
Step 7.
On the node that you want to register, click Register. The Register Node page displays.
Step 8.
In the Storage Block Name field, enter a unique name for the storage block.
Step 9.
In the Administrator Password field, enter a password for the manager account on the storage
block.
Step 10. In the Storage Pool drop-down, assign the storage block to a storage pool from the list.
In the Cloud Controller, storage resources (storage blocks) are organized into storage pools. A
storage block must be added to a storage pool for it to store application instances.
To crate a storage pool:
a.
In the Storage Pool drop-down, select New storage pool ....
b.
Enter a name for the storage pool.
c.
Click Create.
Step 11. Click Register Storage Block to complete registration.
Step 12. Repeat this process to register all remaining storage blocks.
The installation of a hot-swap storage controller is now complete.
.
Chapter 5
Part replacement and maintenance procedures
73