Install the management switch (optional)
This section covers the procedures to install theThinkSystem NE0152T RackSwitch as the management
switch in a ThinkAgile CP solution.
Note: A dedicated out-of-band (OOB) management switch is required for this solution. If the Lenovo
ThinkSystem NE0152T RackSwitch is not used, you must provide an OOB management switch with the
correct configuration. Disregard this procedure if you are not including the NE0152T as the management
switch in your solution.
This section describes how to install the NE0152T switch in a standard 19–inch equipment rack using the
mounting kit included with the switch.
The following parts are included in the standard mounting kit:
Item number
1
2
3
4
5
6
Attention:
• The rack-mounting frame may be unable to support the weight of the switch with only the front post
mounting brackets (2-post application). If the switch has an undesirable amount of sag, it is
recommended to use a 4-post mounting kit.
• For earthquake stability, mount the switch in a 4-post rack.
• If you are using a non-Lenovo switch as the management switch, keep 1U of empty space between the
interconnect switches and the management switch so that power or network cables can use this space.
Statement 26
CAUTION:
Do not place any object on top of rack‐mounted devices.
146
Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures
Description
Mounting brackets
M4 screws
M6 screws
M6 clip nuts
M6 cage nuts
M6 locking washers
Quantity
2
8
4
4
4
4