Lenovo ThinkAgile CP Hardware Part Replacement And Component Maintenance Procedures page 139

Table of Contents

Advertisement

Step 6.
Verify basic switch operation by checking the system LEDs. When operating normally, the PSU1/
PSU2, Diag, and Fan LEDs should all be green.
Step 7.
Connect the network cables.
a.
For the RJ-45 Management port, connect 100-ohm Category 5, 5e or better twisted-pair cable.
b.
Connect DAC cables to the SFP+/QSFP+ slots. Or first install SFP+/QSFP+ transceivers and
then connect fiber optic cabling to the transceiver ports.
The following transceivers are supported:
• 40G QSFP+ SR4 Transceiver 90Y3505
• 10G BASE-T (RJ45) SFP Transceiver SBB7A02090
• 10G SFP+ SR Transceiver 46C3446
Note: As connections are made, check the port status LEDs to be sure the links are valid.
.
Chapter 5
Part replacement and maintenance procedures
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile cp4000Thinkagile cp6000

Table of Contents