Operation; Initial Start-Up; Installation Of Accessories; Preparation - Christ Beta 1-8 LSCbasic Operating Manual

Freeze-dryer
Table of Contents

Advertisement

6

Operation

6.1

Initial start-up

WARNING
6.2

Installation of accessories

6.3

Preparation

6.4

Switching the freeze-dryer on

Version 03/2018, Rev. 1.5 of 09/03/2020 • sb-dc
Translation of the original operating manual
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The ice condenser chamber must be clean and dry.
Remove any water residues from the preceding run.
Close the aeration valve and the media drain valve.
Ensure that all of the valves of the accessories are closed.
Switch the vacuum pump on.
Actuate the mains switch.
The control unit performs a self-test and an initialisation. This may take
several seconds.
Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!
Freeze-dryer Beta 1-8 LSCbasic
Freeze-dryer Beta 2-8 LSCbasic
6 Operation
43 / 107

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Beta 1-8 LSCbasic and is the answer not in the manual?

Questions and answers

Table of Contents