Page 1
Translation of the original operating manuel Rev. 1.9 of 01/12/2021 Alpha 3-4 LSCbasic; ; Version 11/2018 Alpha 3-4 LSCbasic Part no. 102444, 102456, 102445, 102474, 102486, 102475, 102458, 102462, 102460, 102488, 102492, 102490 Freeze-dryer Operating Manual Please retain for later use!
Page 2
Freeze-dryer Alpha 3-4 LSCbasic Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 2 / 117 Translation of the original operating manuel...
Freeze-dryer Alpha 3-4 LSCbasic Table of contents General information ......................9 Importance of the operating manual .................. 9 Intended use ........................9 Warranty and liability....................... 10 Copyright ........................11 Explanation of symbols ....................11 Standards and regulations ....................11 Scope of supply ......................11 Layout and mode of operation ..................
Page 6
Freeze-dryer Alpha 3-4 LSCbasic Table of contents 3.7.9 Hazards caused by hot surfaces ................34 3.7.10 Hazards caused by cold surfaces ................34 3.7.11 Hazards caused by breaking glass ................35 Safety devices ........................ 35 3.8.1 System check ......................35 3.8.2...
Page 7
Freeze-dryer Alpha 3-4 LSCbasic Table of contents Malfunctions and error correction ..................83 General malfunctions ...................... 83 7.1.1 Power failure ......................84 7.1.2 Insufficient vacuum ....................85 7.1.2.1 Small flange connections ................... 85 7.1.2.2 Aeration valve, media drain valve ..............86 7.1.2.3...
Page 8
Freeze-dryer Alpha 3-4 LSCbasic Table of contents Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 8 / 117 Translation of the original operating manuel...
Freeze-dryer Alpha 3-4 LSCbasic 1 General information Pos : 1 /200 C hrist/360 GT- BA Labor-Pil ot ( STAND ARDMODU LE) /010 Allgem eine Inform ationen/010 Allgem eine Informationen================================ @ 24\m od_1404983207982_68.docx @ 182921 @ 1 @ 1 → General information Pos : 2 /200 C hrist/360 GT- BA Labor-Pil ot ( STAND ARDMODU LE) /010 Allgem eine Inform ationen/010- 0010 Stell enw ert der Betriebs anl eitung @ 25\mod_1404983209248_68.doc x @ 182935 @ 2 @ 1...
Any other use beyond this area of application is regarded as improper use. Martin Christ Gefriertrocknungsanlagen GmbH cannot be held liable for any damage resulting from such improper use. The following operations are regarded as NOT PERMISSIBLE: •...
Freeze-dryer Alpha 3-4 LSCbasic 1 General information Copyright The copyright concerning the operating manual remains with Martin Christ Gefriertrocknungsanlagen GmbH. The operating manual is solely intended for the operator and their personnel. It includes instructions and information that may not be •...
Page 12
Freeze-dryer Alpha 3-4 LSCbasic 1 General information Solvent package flask, part no. 102456: Name Part number Freeze-dryer Alpha 3-4 LSCbasic 102372 Capacitive vacuum sensor CMR 364 125498 Vacuum pump Vakuubrand RC6 125295 Corrugated hose, stainless steel 510085 Reducing adapter DN 25/DN 16...
Page 13
Freeze-dryer Alpha 3-4 LSCbasic 1 General information Solvent package flask, part no. 102486: Name Part number Freeze-dryer Alpha 3-4 LSCbasic 102372 Capacitive vacuum sensor CMR 364 125498 Vacuum pump Edwards nXDS 10iC 125251 Corrugated hose, stainless steel 510085 Reducing adapter DN 25/DN 16...
Page 14
Freeze-dryer Alpha 3-4 LSCbasic 1 General information Solvent package flask, part no. 102462 (without vacuum pump, type Vakuubrand RC6): Name Part number Freeze-dryer Alpha 3-4 LSCbasic 102372 Capacitive vacuum sensor CMR 364 125498 Corrugated hose, stainless steel 510085 Reducing adapter DN 25/DN 16...
Page 15
113398 Glass cover 121448 The freeze-dryer Alpha 3-4 LSCbasic may only be used with a chemical- resistant, oil-sealed vacuum pump of the type RC6 by Vakuubrand or a dry-running vacuum pump of the type nXDS 10iC by Edwards and only with the specified configurations.
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation Pos : 16 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/020 Aufbau und Wirk ungsw eise/020 Aufbau und Wirk ungsw eis e=========================== @ 25\mod_1404983235994_68.doc x @ 183019 @ 1 @ 1 →...
Page 17
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation Aeration valve Media drain valve Fig. 3: Left side of the freeze-dryer Touchpanel Fig. 4: User interface with touchpanel Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 17 / 117...
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation 10 Heat exchanger of the refrigeration unit 11 Name plate (see chapter 2.1.2 - "Name plate") 12 Vacuum connection 13 Serial interface 14 Electrical connection of the vacuum sensor 15 Connection of the...
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation Pos : 23 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/020 Aufbau und Wirk ungsw eise/020-0020 Wirkungsweis e------------------------ @ 25\m od_1404983253850_68.docx @ 183047 @ 2 @ 1 → Mode of operation Pos : 24 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/020 Aufbau und Wirk ungsw eise/020-0020-0010 Gefriertrocknung allgem ein @ 25\mod_1404983254815_68.docx @ 183061 @ 3 @ 1...
Page 20
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation Fig. 7: Vapour pressure curve for ice and water From a physical point of view, the freeze-drying process covers three phases (see figure below): (1) Freezing: The product to be dried is frozen under atmospheric pressure.
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation Fig. 8: Freeze-drying phases Please find further information about basic principles, optimum procedures and applications in the brochure "Smart freeze-drying", which can be downloaded at www.martinchrist.de → [Applications] → [Lyophilisation].
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation At the same time, the ice condenser is pre-cooled ("cool-down"). The ice condenser temperature does not have any influence on the product temperature. The sole purpose of the ice condenser is to bind the released water vapour.
Freeze-dryer Alpha 3-4 LSCbasic 2 Layout and mode of operation The required drying time depends strongly on the drying vacuum. At 1.0 mbar, one gram of ice takes up a volume of 1 m of vapour, at 0.1 mbar a volume of 10 m of vapour, and at 0.001 mbar a volume of 100 m...
Pos : 43 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/030 Sic her heit/030-0010 Besc hilderung des Geräts GT @ 25\m od_1404983297040_68.docx @ 183215 @ 2 @ 1 → Marking of the unit The following symbols are used for Christ freeze-dryers: Dangerous voltage On (Power)
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety Pos : 45 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/030 Sic her heit/030-0020 Symbol- und Hi nweis erklär ung en @ 25\mod_1404983298133_68.docx @ 183229 @ 2 @ 1 → Explanation of the symbols and notes...
Page 27
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety • Freeze-drying products with a high solvent concentration may lead to the formation of potentially explosive gas mixtures. This is why the operator must provide standard operating procedures (SOPs) for the freeze-drying of the various products, including specifications concerning the chamber pressure.
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety Pos : 51 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/030 Sic her heit/030-0050 Informell e Sic herheits hinw eise @ 25\m od_1404983301284_68.docx @ 183271 @ 2 @ 1 → Informal safety notes This operating manual is part of the product.
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety Pos : 64 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/030 Sic her heit/030-0070 Si cherheits hinw eis e z um Betri eb @ 36\m od_1435842611820_68.docx @ 266767 @ 2 @ 1 Safety notes concerning the operation The following notes and instructions concerning the operation of the freeze- dryer must be observed in order to protect all persons and property.
This may lead to severe injuries. DANGER Freeze-drying of products containing acids is only permissible if special protective measures and equipment-related precautions are taken! Consultation of Martin Christ Gefriertrocknungsanlagen GmbH is absolutely mandatory in order to define the measures that need to be taken! •...
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety Pos : 76 /200 C hrist/360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/030 Sic her heit/030-0010 Sic her heit Labor/030- 0070-0100 Gefahr en durc h k ontami nierte Vakuum pum penabg ase (Vakuum pum pe mit Öl) Labor @ 86 \mod_1635778833571_68.doc x @ 905948 @ 3 @ 1 3.7.6...
Freeze-dryer Alpha 3-4 LSCbasic 3 Safety 3.7.8 Dry-running vacuum pump: hazards caused by contaminated exhaust air Danger of poisoning/infection due to contaminated exhaust air The exhaust air may contain harmful substances originating from the product. Contact with particles in the exhaust air (especially by inhalation) may WARNING result in severe damage to health.
• Stop the freeze-dryer immediately in the event of a malfunction. Eliminate the malfunction (see chapter 7 - "Malfunctions and error correction") or contact the after-sales service of Firma Martin Christ Gefriertrocknungsanlagen GmbH (see chapter 7.3 - "Service contact"). •...
→ 3.12 Remaining hazards All Christ freeze-dryers were built state-of-the-art and according to the accepted safety rules. Danger to life and limb of the operator, or of third parties, or impairments of the units or other material assets, however, cannot be completely excluded when the units are being used.
The operating voltage on the name plate must correspond to the local supply voltage! DANGER Christ freeze-dryers are units of protection class I. Freeze-dryers of this type have a three-wire power cord with an IEC C13 connector (see chapter 10 - "Technical data").
Pos : 130 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/050 Aufs tell ung und Ansc hluss /050-0060 Ölgedic htete Vak uumpumpe Alpha 3-4 @ 59\mod_1534401557611_68.doc x @ 589528 @ 2 @ 1...
Page 47
Freeze-dryer Alpha 3-4 LSCbasic 5 Set-up and connection Label indicating the maximum current Fig. 12: Indication of the maximum current for the vacuum pump (example) The oil mist that escapes from the pump during operation must be retained or discharged via an exhaust filter (oil mist separator).
Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1 Pos : 154 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/060 Betrieb/060- 0050-0010-0010 H auptfenster Proz ess - nur Alpha 3- 4 @ 84\mod_1627895638212_68.doc x @ 884138 @ 4 @ 1 6.4.1.1...
Page 60
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Status line (1) This line shows the operating status of the freeze-dryer as well as the active phase. The status line also shows the current date and time. The clock is battery- buffered and must be reset after a failure (siehe chapter 6.4.1.2 - "Main window "Options"", Absatz "Verwaltung").
Page 61
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Value windows (3) This area shows the current process data. The three value windows can be configured as desired. • Select the button of the value window that is to be adapted. A dialogue box with the possible parameters opens: –...
Page 62
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Vapour pressure curve for ice and water A diagram shows the relationship between the pressure and sample temperature for aequous systems. The pressure and temperature values can be changed by way of the buttons or by moving the arrows (see item 1 in the screenshot).
Page 63
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Button "Set" (5) This button is used to enter the set values for the individual phases of the freeze-drying process prior to the start of the process. Value ranges have been saved for the various phases. These value ranges can be displayed in the input window with the aid of the buttons "min"...
Page 64
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation The fault has been eliminated, but the message has not been acknowledged The fault has not be eliminated and the message has not been acknowledged The fault has not been eliminated yet, but the...
Page 65
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation The texts of the process and error messages are not included in this operating manual. The associated documents can be requested from our service department. NOTE Dialogue box "Operating mode: select/start" (7) After the set values have been entered for the process, the process can be started with this function (see chapter 6.4.2 - "Starting a freeze-drying...
Page 66
(see the following illustration). Fig. 35: Results of the performance tests Evaluation: Please contact Martin Christ Gefriertrocknungsanlagen GmbH for an assessment of the results. Button "Stop" (8) Pressing this button stops the current process. The freeze-dryer switches to standby.
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Pos : 156 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/060 Betrieb/060- 0050-0010-0030 H auptfenster Optionen nur Alpha 3- 4 @ 84\m od_1627896865910_68.docx @ 884157 @ 4 @ 1 6.4.1.2 Main window "Options"...
Page 68
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Scale unit (2) This dialogue box is used to change the unit of measurement for the temperature and vacuum values. Fig. 38: Dialogue box "Change scale unit" Administration "Administration" options: "Date/Time" "Network" "System properties"...
Page 69
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Date/Time (1) The control system is equipped with an integrated, battery-buffered clock. After a failure of the buffer battery, the date and time must be reset. Fig. 40: Dialogfenster "Datum/Zeit ändern" Network (2) This dialogue box is used to change the network settings.
Page 70
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation System properties (3) This dialogue box is used to change the system settings. Fig. 42: Dialogue box "System properties" Beeper: The beeper sounds in the event of a malfunction, for example. • If the setting is "On", the beeper sounds at intervals of a few seconds until the message is acknowledged.
Page 71
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Fig. 43: Dialogue box "Access protection" Nur bei aktiviertem Zugriffsschutz können die weiteren Schaltfelder aktiviert werden. NOTE Password timer runtime: In order to prevent unauthorised access, the system will automatically switch back to the default setting after a pre- defined period of time.
Page 72
• Select the button "Add option". An input window opens. • Enter the six-digit CHRIST activation code that was supplied for this option. Note that the code is case-sensitive. Options can be removed in the same way. The changes will not become effective until after a restart of the freeze- dryer..
Page 73
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Service "Service" options: "Operating hours" "Failure memory" "Vacuum pump oil change" "Maintenance" "Sensor adjustment" Fig. 47: Dialogue box "Service" (varies depending on the type of freeze-dryer) Operating hours (1) This dialogue box is used to view the number of operating hours of the various components of the freeze-dryer, e.g.
Page 74
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Failure memory (2) The failure memory stores the most recent messages of the process and equipment information system. The messages can be viewed in this dialogue box. The failure memory includes the last 32 messages. If this number is exceeded, the oldest message will be overwritten.
Page 75
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Fig. 50: Dialogue box "Vacuum pump oil change" " Maintenance (4) The maintenance interval of the freeze-dryer is set at 3,000 operating hours or at least one maintenance per year. When the end of a maintenance interval is reached, a corresponding message will be displayed.
Page 76
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Sensor adjustment (5) In this dialogue box, the sensors are adjusted based on a predefined reference value. Sensors that are not properly adjusted will lead to incorrect measurements which, in turn, will have a negative effect on the process control.
Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1 Pos : 163 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/060 Betrieb/060- 0050-0022-0010 Ei ngabe der Sollw erte - nur Alpha 3- 4 @ 84\m od_1627902364405_68.docx @ 884197 @ 4 @ 1 6.4.2.1...
Page 79
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Viewing or editing the set values • Press the button "Set" (see chapter 6.4.1.1 - "Main window "Process""). The following dialogue box will be displayed: Set value "Section time" Set value "Vacuum" Set value "Pressure notification"...
Page 80
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Fig. 55: Warning issued when the vacuum limit is exceeded • If the value is above the upper limit of the working range, the actual value will be displayed as ">1 mbar" in the value window.
Page 81
Freeze-dryer Alpha 3-4 LSCbasic 6 Operation Defrosting (4) This button is used to pre-define the defrosting time and temperature. Numerical values can be edited with the aid of a numerical keypad: Set value display Button for changing the sign (e.g. when entering temperature values) ""...
(see chapter 7.3 - "Service contact") If it is impossible to eliminate the errors, contact the Christ service department! NOTE Pos : 174 /010 Univ ers almodul e/ Leerz eile @ 0\mod_1202116244500_0.docx @ 114 @ @ 1 Pos : 175 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMODULE)/070 Störungen und F ehl ersuche/070- 0010- 0010 Netzaus fall @ 25\mod_1404984058964_68.doc x @ 184153 @ 3 @ 1...
8 Maintenance and service Pos : 196 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/080 Wartung und Instandhaltung/080 Wartung und Instandhaltung Al pha 3-4 LSCbasic =========================== @ 67\mod_1568783988137_68.doc x @ 716853 @ 1 @ 1 →...
Page 90
Pos : 201 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/080 Wartung und Inst andhaltung/080-0010-0010a R ei nigung der Trock nungsk amm er und des Dec kels Al pha 3-4 @ 60\mod_1539595639666_68.docx...
Freeze-dryer Alpha 3-4 LSCbasic 8 Maintenance and service Do not clean the film while dry. CAUTION • Use soft cloths, soft sponges made of synthetic fibres or rubber squeegees and common household cleaning agents (glass cleaner) for cleaning. The cleaning agents must be free from abrasive agents.
Check the heat exchanger at least once per month for soiling and clean it if necessary. • Please contact the Christ service department if you have any queries (see chapter 7.3 - "Service contact"). Pos : 208 /010 Univ ers almodul e/ Seitenwechs el @ 0\mod_1202116244312_0.docx @ 105 @ @ 1...
Freeze-dryer Alpha 3-4 LSCbasic 8 Maintenance and service Pos : 221 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMODULE)/080 W artung und Instandhaltung/080-0020 D esi nfektion von Tr ock nungskamm er und Z ubehör @ 25\m od_1404984107851_68.docx @ 184461 @ 2 @ 1 →...
Page 98
Freeze-dryer Alpha 3-4 LSCbasic 8 Maintenance and service Outside Germany: Contact our agency in your country. All agencies are listed at www.martinchrist.de → [Sales Partners] If you would like to utilise our after-sales-service, please state the type of your freeze-dryer and its serial number.
Freeze-dryer Alpha 3-4 LSCbasic 8 Maintenance and service Pos : 226 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMODULE)/080 W artung und Instandhaltung/080-0050 R ücks endung defekter T eile @ 25\mod_1404984111088_68.doc x @ 184503 @ 2 @ 1 →...
Pos : 230 /200 Chris t/360 GT-BA Labor-Pil ot ( STAND ARDMODULE)/090 Entsorgung/090-0010 Entsorgung der Gefriertr ock nungsanlag e @ 25\m od_1404984141122_68.docx @ 184531 @ 2 @ 1 → Disposal of the freeze-dryer Martin Christ Gefriertrocknungsanlagen GmbH is a registered manufacturer of electric and electronic devices that are solely intended for commercial use.
11 Appendix Pos : 245 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/110 Anhang/0110- 0030 C E-Erkl ärung MaschR L Alpha 3-4 LSCbasic @ 59\mod_1534401722876_68.doc x @ 589705 @ 22 @ 1 →...
Page 104
Freeze-dryer Alpha 3-4 LSCbasic 11 Appendix Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 104 / 117 Translation of the original operating manuel...
Freeze-dryer Alpha 3-4 LSCbasic 11 Appendix Declaration of conformity – China RoHS 2 11.2 Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 105 / 117 Translation of the original operating manuel...
Page 106
Freeze-dryer Alpha 3-4 LSCbasic 11 Appendix Pos : 246 /010 Univ ers almodul e/ Seitenwechs el @ 0\mod_1202116244312_0.docx @ 105 @ @ 1 Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 106 / 117 Translation of the original operating manuel...
Pos : 252 /200 Chris t/361 GT-BA Labor-Pil ot ( PROJ EKTE)/Alpha/Al pha 1- 4_2-4_3-4 Standard/Alpha 3-4 LSCbasic/060 Betrieb/900 Gl oss ar GT Labor - nur Al pha 3-4 LSCbasic ============================================ @ 84\m od_1627904200774_68.docx @ 884235 @ 1 @ 1...
Page 112
Freeze-dryer Alpha 3-4 LSCbasic 12 Glossary Version 11/2018, Rev. 1.9 of 01/12/2021 • sb 112 / 117 Translation of the original operating manuel...
Freeze-dryer Alpha 3-4 LSCbasic Index 13 Index Connection of the vacuum sensor ....18 Connection requirements ......101 Access protection........70 Contaminated condensate (hazards) ..... Accessories ........37, 89, 96 ..........32, 44, 86, 91 Accessories (installation) ......50 Contaminated defrosting water (hazards) ..
Page 114
Freeze-dryer Alpha 3-4 LSCbasic Index Dimensions ........39, 102 Direct hazard to the life and health ..... 25 General conditions ........10 Disinfectants ..........97 General information on freeze-drying ..19 Disinfection of the drying chamber and General malfunctions ......... 83 accessories ..........
Page 115
Freeze-dryer Alpha 3-4 LSCbasic Index Insufficient ice condenser or shelf temperature ..........84 Name plate ..........18 Insufficient ice condenser temperature ..87 Network ............. 69 Insufficient vacuum ......83, 85 Network drive ..........60 Intended use ..........9 No indication on the display ....... 83 IP protection category according to DIN Noise level ..........
Page 116
Freeze-dryer Alpha 3-4 LSCbasic Index Process and equipment messages .... 63 Signs of corrosion ........96 Process and error messages ..... 87 Small flange connections ......85 Process data ..........59 Solvents ............. 36 Products, harmful (hazards) ....32, 90 Solvents.
Page 117
Freeze-dryer Alpha 3-4 LSCbasic Index UV radiation ......... 42, 89 Vacuum system (maintenance) ....94 Vakuummesssonde (Installation) ....45 Value windows ........... 61 Vacuum connection ......18, 102 Vapour pressure curve for ice and water ..Vacuum pump ..........46 ............
Need help?
Do you have a question about the Alpha 3-4 LSCbasic and is the answer not in the manual?
Questions and answers