Chapter 6 Maintenance; Maintenance Inspection - EDAN FTS-3 Service Manual

Fetal telemetry system
Table of Contents

Advertisement

FTS-3 Fetal Telemetry System Service Manual

Chapter 6 Maintenance

6.1 Maintenance Inspection

(1) Visual Inspection
Please perform the following check before you use FTS-3:
 Check the base station and transducers to see if there is any visible damage that may
affect patient's safety.
 Check all the outer cables, power socket and power cables.
 Check if the system functions properly.
If any damage is detected, replace the damage part(s) or contact EDAN immediately.
(2) Routine Inspection
The overall check of FTS-3, including the safety check and functional check, should be
performed by qualified personnel every 6 to 12 months, and each time after service.
The equipment should undergo periodic safety test to insure proper patient isolation from live
parts. This should include leakage current measurement and insulation testing. The recommended
testing interval is once a year or as specified in the institution's test and inspection protocol.
Ground Leakage Current (Limit)
Enclosure Leakage Current (Limit)
Patient Leakage Current (Limit)
FHR1, FHR2, TOCO
Patient Auxiliary Current (Limit)
FHR1, FHR2, TOCO
Patient Leakage Current (Limit)
DECG, MHR(from MECG)
Patient Auxiliary Current (Limit)
DECG, MHR(from MECG)
N.C.
S.F.C.
500µA
1000µA
N.C.
S.F.C.
100µA
500µA
N.C.
S.F.C.
d.c. 10µA
50µA
a.c. 100µA
500µA
N.C.
S.F.C.
d.c. 10µA
50µA
a.c. 100µA
500µA
N.C.
S.F.C.
d.c. 10µA
50µA
a.c. 10µA
50µA
N.C.
S.F.C.
d.c. 10µA
50µA
a.c. 10µA
50µA
- 15 -
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents