Connecting Power Cable - EDAN FTS-3 Service Manual

Fetal telemetry system
Table of Contents

Advertisement

FTS-3 Fetal Telemetry System Service Manual
2. Fix the base station on the middle tray and ensure that it will not fall off when crossing the
steps.

3.5 Connecting Power Cable

Make sure the AC power supply of the system complies with the following specification:
100V-240V~, 50Hz/60Hz.
If the protective grounding (protective earth) system is doubtful, the power of the system must be
supplied by internal power supply only.
NOTE:
1
Make sure the system and the power outlet are placed at a place where it is easy to
connect and disconnect the power cord.
2
When AC mains are interrupted, the device switches to internal power supply and
operates normally if the battery is installed. If the battery is not installed, the system
shuts down and resumes the previous settings at the subsequent operation.
3
After the AC power supply is connected, please wait for at least 2 seconds before
pressing the POWER switch to turn on the system.
Figure 2- 5 FTS-3 on a Trolley (Sketch Map)
WARNING
- 12 -
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents