Optical Ila Site Preparation Checklist - Juniper PTX3000 Hardware Manual

Optical inline amplifier hardware guide
Hide thumbs Also See for PTX3000:
Table of Contents

Advertisement

Optical ILA Site Preparation Checklist

The checklist in
Table 13 on page 42
an optical ILA installation.
Table 13: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed the
optical ILA tolerances.
Power
Measure the distance between external power
sources and the optical ILA installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the optical ILA.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
summarizes the tasks you need to perform when preparing a site for
For More Information
"Optical ILA Environmental
Requirements and
Specifications" on page 44
"Optical ILA AC Power
Specifications" on page 36
"DC Power Specifications for
the Optical ILA" on page 38
"Optical ILA Rack
Requirements" on page 46
"Optical ILA Cabinet
Requirements" on page 47
"Optical ILA Clearance
Requirements for Airflow and
Hardware Maintenance" on
page 45
Performed by
Date
42

Advertisement

Table of Contents
loading

Table of Contents