Download Print this page

Krick Fishing Cutter Antje Building Instructions page 37

Advertisement

Available languages

Available languages

3.3
Fig. substructure
Now the substructure can be primed with pore
filler and then painted.
In the next step you can build the wheelhouse.
3.8
3.9
3.13
Fig. parts structure
In the first step, stain the appropriate parts of the
superstructure depending on whether the cas-
settes and window frames should become light or
dark.
Fig. superstructure parts stained and glued
After staining, the parts can be combined for as-
sembly.
Stand Mai 2019
3.12
3.6
3.7
3.10
3.4
3.5
Seite 9
3.14
Fig. superstructure with roof traverse
After the traverse part 3.15 has been placed, tape
the roof cut-out all around with tape.
3.15
3.16
3.15
Fig. frame for roof
Fig. gluing the frame for the roof
You can now glue the frame from parts 3.15 and
3.16. After the adhesive has dried, the frame can
be removed from the structure and the roof part
3.17 glued on.
3.17
Fig. roof frame and roof
©
Krick Modelltechnik Knittlingen
3.16

Advertisement

loading