TTL / HTL - Encoder Interface
2.
Installation and Start-up
2.1
Mechanical installation
All kind of works on the inverter may be carried out by authorized personnel in accordance
with the EMC and safety rules only.
• Switch inverter de-energized and await capacitor discharge time
• Pull off operator
• Remove plastic cover
• Remove fixing bolt
• Fix interface board beginning from the socket connector straightly
• Screw in fixing bolt
• Attach plastic cover
2.2
Electrical installation TTL encoder
Connection of the TTL encoder to X3A
14
Motor encoder plug
�
�
�
�
�
��
��
�
��
�
�
�
���
��
�
���
�
��
�
���
�
���
��
���
��
Connect-up exter-
nal shield at the
respective connec-
tor housing !
Socket X3A
5
4
3
2
1
10
9
8
7
6
15
14
13
12
11
���
Core color
green
�
��
yellow
�
���
blue
�
��
red
�
���
white
�� ���
brown
�� ���