5. Connect the power supply connector to the overlay.
NOTE: The power supply connector does not go all the way in.
6. To continue the installation, complete the following procedures:
–
mount the overlay by using a mounting bracket (page 9) or four corner brackets
(page 19)
–
attach either a pen tray (page 23) or a controller (page 25)
–
complete the installation (page 27)
To mount the overlay on a flat-panel display using a mounting bracket
IMPORTANT
The steps below are appropriate for mounting the overlay using a mounting
bracket. If your interactive whiteboard came with four corner brackets, refer to
the instructions on page 19.
CAUTION
You'll need assistance with several of the steps in this procedure.
NOTE: Take a moment to look at the text and the arrows on the centre section of the mounting
bracket.
Installing the Interactive Whiteboard
Power Supply
Power Port
Power Connector
9
Need help?
Do you have a question about the Board and is the answer not in the manual?
Questions and answers