6
6
nx4510/nx5010/nx5510/nx6010
nx4510/nx5010/nx5510/nx6010
-
-
REMOvAL AND INsTALLATION Of 3-POINT HITCH IMPLEMENT (wITH PTO sHAfT)
(1) Implement support
1. place implement on the level
ground.
2. drive the tractor backward to move
as close as possible to an imple-
ment. (approx. 5 cm)
then, adjust the height of the low-
er link to be parallel to the pins of
the implement.
3. put all the shift levers in the neu-
tral position.
TE120(NX4510,5010,5510)CABIN,ROP2 2
A40O613A
(2) Lower Link
(1) check Link pin
4. Remove the pins on either side of
the check link.
A40O607A
(1) Lever
(2) ball Assembly
5. Remove the ball assembly by
pushing the guide pin operating
lever.
A40O612A
2014-03-27 오후 3:22:22