IMPLEMENTATION

5
IMPLEMENTATION
5.1

General Timeline/Durations

5.1.1

Overview

General Information
The actual timeline for each project varies from installation to installation. The above timeline may
only be used as a guide. The actual timeline can only be confirmed after the Brainlab layout
drawings have been approved and signed by the customer. This normally occurs during the
detailed planning phase.
It is recommended that the customer nominates an appropriate, dedicated project manager or
technical representative for planning and installation who will communicate customer-specific
requirements to the Brainlab technical consultant. Experience has shown that a well-coordinated
hospital project team greatly contributes to keeping the project timeline on schedule.
Site Planning Manual Rev. 1.1 Buzz Ver. 2.0
Figure 33
57

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Buzz and is the answer not in the manual?

Table of Contents