8 Piping installation

In this chapter

8.1 Preparing refrigerant piping

8.1.1 Refrigerant piping requirements

ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 - 2020.08
8.1
Preparing refrigerant piping ...................................................................................................................................................
8.1.1
Refrigerant piping requirements ...........................................................................................................................
8.1.2
Refrigerant piping insulation..................................................................................................................................
8.2
Preparing water piping ...........................................................................................................................................................
8.2.1
Water circuit requirements ...................................................................................................................................
8.2.2
Formula to calculate the expansion vessel pre-pressure......................................................................................
8.2.3
To check the water volume and flow rate.............................................................................................................
8.2.4
Changing the pre-pressure of the expansion vessel .............................................................................................
8.2.5
To check the water volume: Examples ..................................................................................................................
8.3
Connecting the refrigerant piping..........................................................................................................................................
8.3.1
About connecting the refrigerant piping...............................................................................................................
8.3.2
Precautions when connecting the refrigerant piping............................................................................................
8.3.3
Guidelines when connecting the refrigerant piping..............................................................................................
8.3.4
Pipe bending guidelines .........................................................................................................................................
8.3.5
To flare the pipe end..............................................................................................................................................
8.3.6
To braze the pipe end ............................................................................................................................................
8.3.7
Using the stop valve and service port....................................................................................................................
8.3.8
To connect the refrigerant piping to the outdoor unit .........................................................................................
8.3.9
To connect the refrigerant piping to the indoor unit............................................................................................
8.4
Checking the refrigerant piping..............................................................................................................................................
8.4.1
About checking the refrigerant piping...................................................................................................................
8.4.2
Precautions when checking the refrigerant piping ...............................................................................................
8.4.3
To check for leaks...................................................................................................................................................
8.4.4
To perform vacuum drying ....................................................................................................................................
8.4.5
To insulate the refrigerant piping ..........................................................................................................................
8.5
Charging refrigerant ...............................................................................................................................................................
8.5.1
About charging refrigerant ....................................................................................................................................
8.5.2
Precautions when charging refrigerant .................................................................................................................
8.5.3
To determine the additional refrigerant amount..................................................................................................
8.5.4
To determine the complete recharge amount......................................................................................................
8.5.5
To charge additional refrigerant ............................................................................................................................
8.5.6
To fix the fluorinated greenhouse gases label.......................................................................................................
8.6
Connecting water piping ........................................................................................................................................................
8.6.1
About connecting the water piping .......................................................................................................................
8.6.2
Precautions when connecting the water piping....................................................................................................
8.6.3
To connect the water piping..................................................................................................................................
8.6.4
To connect the water piping for domestic hot water ...........................................................................................
8.6.5
To connect the recirculation piping....................................................................................................................... 101
8.6.6
To fill the water circuit ........................................................................................................................................... 101
8.6.7
To fill the domestic hot water tank........................................................................................................................ 101
8.6.8
To insulate the water piping .................................................................................................................................. 102
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Piping material: Phosphoric acid deoxidised seamless copper.
Piping diameter:
Liquid piping
Gas piping
Piping temper grade and thickness:
 9].
Ø6.4 mm (1/4")
Ø15.9 mm (5/8")
8
Piping installation
|
"2  General safety
Installer reference guide
75
75
76
76
76
80
80
82
83
84
84
84
85
86
86
87
87
89
89
90
90
90
91
91
92
93
93
94
94
94
94
95
95
95
96
96
98
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents