8 Piping installation
In this chapter
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 - 2020.08
8.1
Preparing refrigerant piping ...................................................................................................................................................
8.1.1
Refrigerant piping requirements ...........................................................................................................................
8.1.2
Refrigerant piping insulation..................................................................................................................................
8.2
Preparing water piping ...........................................................................................................................................................
8.2.1
Water circuit requirements ...................................................................................................................................
8.2.2
8.2.3
8.2.4
8.2.5
8.3
Connecting the refrigerant piping..........................................................................................................................................
8.3.1
8.3.2
8.3.3
8.3.4
Pipe bending guidelines .........................................................................................................................................
8.3.5
To flare the pipe end..............................................................................................................................................
8.3.6
To braze the pipe end ............................................................................................................................................
8.3.7
8.3.8
8.3.9
8.4
Checking the refrigerant piping..............................................................................................................................................
8.4.1
8.4.2
8.4.3
To check for leaks...................................................................................................................................................
8.4.4
To perform vacuum drying ....................................................................................................................................
8.4.5
8.5
Charging refrigerant ...............................................................................................................................................................
8.5.1
About charging refrigerant ....................................................................................................................................
8.5.2
8.5.3
8.5.4
8.5.5
8.5.6
8.6
Connecting water piping ........................................................................................................................................................
8.6.1
8.6.2
8.6.3
To connect the water piping..................................................................................................................................
8.6.4
8.6.5
8.6.6
To fill the water circuit ........................................................................................................................................... 101
8.6.7
8.6.8
To insulate the water piping .................................................................................................................................. 102
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
▪
Piping material: Phosphoric acid deoxidised seamless copper.
▪
Piping diameter:
Liquid piping
Gas piping
▪
Piping temper grade and thickness:
9].
Ø6.4 mm (1/4")
Ø15.9 mm (5/8")
8
Piping installation
|
"2 General safety
Installer reference guide
75
75
76
76
76
80
80
82
83
84
84
84
85
86
86
87
87
89
89
90
90
90
91
91
92
93
93
94
94
94
94
95
95
95
96
96
98
75