Piping Installation; Preparing Water Piping; Water Circuit Requirements - Daikin ETVH16UE6V7 Installer's Reference Manual

Table of Contents

Advertisement

8
|

Piping installation

8 Piping installation
In this chapter

8.1 Preparing water piping

8.1.1 Water circuit requirements

Installer reference guide
84
INFORMATION
This unit is a heating only model. Therefore, all references to cooling in this
document are NOT applicable.
8.1
Preparing water piping ...........................................................................................................................................................
8.1.1
Water circuit requirements ...................................................................................................................................
8.1.2
Formula to calculate the expansion vessel pre-pressure......................................................................................
8.1.3
To check the water volume and flow rate.............................................................................................................
8.1.4
Changing the pre-pressure of the expansion vessel .............................................................................................
8.1.5
To check the water volume: Examples ..................................................................................................................
8.2
Connecting water piping ........................................................................................................................................................
8.2.1
About connecting the water piping .......................................................................................................................
8.2.2
Precautions when connecting the water piping....................................................................................................
8.2.3
To connect the water piping..................................................................................................................................
8.2.4
To connect the water piping for domestic hot water ...........................................................................................
8.2.5
To connect the recirculation piping.......................................................................................................................
8.2.6
To fill the water circuit ...........................................................................................................................................
8.2.7
To protect the water circuit against freezing ........................................................................................................
8.2.8
To fill the domestic hot water tank........................................................................................................................ 102
8.2.9
To insulate the water piping .................................................................................................................................. 102
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN 4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
Connecting piping - Legislation. Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
Connecting piping - Force. Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.
Connecting piping - Tools. Only use appropriate tooling to handle brass, which is
a soft material. If NOT, pipes will get damaged.
 10].
84
84
88
88
90
91
91
91
92
92
95
98
98
98
"2  General safety
EPRA14~18D + ETVH16SU18+23E
Daikin Altherma 3 H HT F
4P644738-1D - 2023.10

Advertisement

Table of Contents
loading

Table of Contents