7.1.3 Installation site requirements of the indoor unit
ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 – 2020.08
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
▪
The indoor unit is designed for indoor installation only and for the following
ambient temperatures:
-
Space heating operation: 5~30°C
-
Space cooling operation: 5~35°C
-
Domestic hot water production: 5~35°C
▪
Mind the following measurements guidelines:
Maximum refrigerant piping length between indoor unit and
outdoor unit
Minimum refrigerant piping length between indoor unit and
outdoor unit
Maximum height difference between indoor unit and outdoor
unit
▪
Mind the following spacing installation guidelines:
≥100
≥500
INFORMATION
If you have limited installation space, do the following before installing the unit in its
final position:
remove one or both side panels.
▪
The foundation must be strong enough to bear the weight of the unit. Take the
weight of the unit with a domestic hot water tank full of water into account.
Make sure, in the event of a water leak, water cannot cause any damage to the
installation space and surroundings.
Do NOT install the unit in places such as:
▪
In places where a mineral oil mist, spray or vapour may be present in the
atmosphere. Plastic parts may deteriorate and fall off or cause water leakage.
▪
Sound sensitive areas (e.g. near a bedroom), so that the operation noise will
cause no trouble.
▪
In places with high humidity (max. RH=85%), for example a bathroom.
▪
In places where frost is possible. Ambient temperature around the indoor unit
must be >5°C.
9].
≥650
(mm)
"7.4.4 To connect the drain hose to the
7
Unit installation
|
"2 General safety
30 m
3 m
20 m
4
drain" [
73]. It requires to
Installer reference guide
59