To Connect The Changeover To External Heat Source - Daikin Altherma 3 R F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R F:
Table of Contents

Advertisement

9
|
Electrical installation

9.3.8 To connect the changeover to external heat source

Installer reference guide
122
2
1
X2M
7
9
A4P
Y2
YC
A
B
A
B
a Installation of EKRP1HBAA is required.
b Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C] Bivalent
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
1+2
Wires connected to the space
cooling/heating ON/OFF output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
3
required.
7
7
9
X2M
b
"7.2.4 To open the indoor
Y2
A4P
a
4
unit" [
 62]):
ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 – 2020.08
1
3
2