9.3.4 To connect the electricity meters

9.3.5 To connect the domestic hot water pump

ERGA04~08EAV3(A) + EHVH04+08SU18+23EA6V
Daikin Altherma 3 R F
4P629090-1 – 2020.08
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A] Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/6 and X5M/4; the negative polarity to X5M/5
and X5M/3.
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
A
B
A
B
3 Fix the cable with cable ties to the cable tie mountings.
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC, 1 A
(continuous)
"7.2.4 To open the indoor
S3S
S2S
3
4
5
6
3 4 5 6
X5M
9
Electrical installation
|
4
unit" [
 62]):