Initial Setup - Assa Abloy Norton 6300 Series Programming Instructions Manual

Full feature low energy operator
Hide thumbs Also See for Norton 6300 Series:
Table of Contents

Advertisement

6300 Series Programming Instructions

Initial Setup

1.
With building power feed turned off, route
120VAC wiring through conduit hole in
backplate. (Figure 1)
2.
Connect 120VAC power to power supply: HOT to
"L", NEUTRAL to"N", GROUND to Ground.
(Figure 1)
3.
Use supplied green connectors to wire in any
devices needing outputs, such as electric strikes,
mag locks, exit devices, door open position
output, etc. (Figure 2) See Input Connections and
Output Connections on page 8 for information.
4.
Turn on building power feed. Power will normally
be "On" for operator. Power can be turned on or
off by pressing power button. (Figure 2)
NOTE: On control board there should be one
solid red LED for POWER and one white LED
that flashes every 1.5 - 2 seconds for STATUS.
CLOSE button of Setup Buttons should be
flashing orange continuously. (Figure 2)
Note: If red LED is flashing, refer to
Troubleshooting section of this manual or
contact Technical Product Support.
5.
Confirm ON/OFF/HO switch is in the ON position.
(Figure 3)
Copyright © 2019, ASSA ABLOY Accessories and Door Controls Group, Inc. All rights reserved. Reproduction in whole or
in part without the express written permission of ASSA ABLOY Accessories and Door Controls Group, Inc. is prohibited.
80-9363-0015-020 Rev 1 11/19
L, N and Ground
Connections
Figure 1
Door Setup
REQUIRED
Figure 2
Shown in
ON Position
Figure 3
Conduit Hole
GO
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents