Braun VISTA Series Installation & Service Manual page 18

Commercial wheelchair lift
Hide thumbs Also See for VISTA Series:
Table of Contents

Advertisement

tion of the dual-cylinder VL917
Series, hydraulic fluid expansion,
contraction or seepage may
occur. Any of these conditions
can result in platform drift (failure
to hold the platform in the folded
or raised position). Platform drift
may occur during lift shipment
and/or between extended
periods of non-lift use.
Plastic straps secure the lift in
the stowed position during
shipment. Before removing the
shipping straps, install the lift
and power the platform to the
fully folded position (press IN
switch).
W ARNING
Install lift and power
platform to fully
folded position before
removing shipping
straps. Failure to do
so may result in
serious bodily injury
and/or property
damage.
Pre-Installation Notes
Lift Ground
Two ground cables are provided.
One ground cable is connected to
the pump. The second ground
cable is external (battery
mounted). Both cables must be
mounted to a common vehicle
framing member to provide
optimum ground.
Pump Mounted Ground Cable:
A ground cable is connected to the
pump. The cable must be con-
nected to a main front-to-rear
vehicle framing member. Route,
position and secure the cable as
outlined on page 17.
Vehicle Battery Ground Cable:
The external battery ground cable
supplied with the lift must be
connected to the same vehicle
framing member that the pump
ground cable is attached to.
Note: Remove undercoating, dirt,
rust, etc. from the framing member
around ground cable mounting
holes (minimum 5/8" diameter
area). Apply a protective coating
of grease to mounting hole to
prevent corrosion. Failure to do
so will void warranty of certain
electrical components.
Lift Installation Checklist
A generic Lift Installation
Checklist is provided as a final
installation checklist to be given
to your customer. This checklist
is the last page in this manual.
Complete, remove (tear out) and
forward the Lift Installation
Checklist (or a copy) to your
customer to confirm that this lift
has been properly installed.
Preventive Maintenance
Checklist
A generic Daily Preventive
Maintenance Checklist is
provided in this manual (next
to last page) for your transit
agency's use. The form can
be tailored to your particular
application.
Page 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vista vl917ib

Table of Contents