Design Lifting Capacity; Test Lift Operation; Positioning And Clearance Checklist - Braun VISTA Series Installation & Service Manual

Commercial wheelchair lift
Hide thumbs Also See for VISTA Series:
Table of Contents

Advertisement

Design Lifting Capacity

Vista Series lifts are rated at a
design lifting capacity of 800
pounds. The combination of lift
base plate, mounting bolts,
underfloor reinforcement bars and
the vehicle floor/chassis configu-
6

Test Lift Operation

Open the door(s) fully, stand
clear and press the orange
UNFOLD switch. Observe all
points of the lift as it unfolds to
be certain that the lift does not
contact the door opening. If any
contact occurs, the lift must be
repositioned.
Press the red DOWN switch to
lower the platform. There must
be a minimum 1" clearance
between the lift and the vehicle
as the platform lowers. The lift
must be repositioned if there is

Positioning and Clearance Checklist

Vehicle Clearance:
Vertical arms and parallel arms must clear door
opening (vertical sides) as lift unfolds and folds
(see points 1 and 2).
Parallel arms (bottom side) must clear door sill
when lift is fully lowered (see point 3).
There must be 1/2" clearance between the lift
and the vehicle door(s) when the platform is
completely folded (see point 5).
Page 22
Lift Installation Instructions
ration must support the lift and
the lift load.
Note: Visually check alignment
of towers and vertical arms while
testing lift operation. Refer to the
not a minimum 1" clearance.
Review the Positioning and
Clearance Checklist. Be
certain the lift is properly posi-
tioned and clearance is ad-
equate. The lift must be
repositioned if any contact
occurs!
Repositioning: Loosen or
remove mounting hardware and
carefully reposition the lift if
needed to meet the positioning
and clearance specifications.
Positioning and Clearance
Checklist and corresponding
illustrations. Note: Refer to the
Bolt Tightening section and
Figure M on page 16 also. Adjust
tightness of mounting hardware to
maintain proper alignment.
Then, bolt the lift in position as
detailed in Step 2.
Review lift securement details in
Step 2 to ensure the lift is
properly mounted.
Note the angle of the platform
when it reaches ground level.
Platform angle must be prop-
erly adjusted. Follow the Plat-
form Angle Adjustment In-
structions on pages 26 and 27
to achieve the proper platform
angle.
Lift must clear door-mounted control box when
door is closed (see point 6).
The lift must clear vehicle by minimum 1" (see
point 7).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vista vl917ib

Table of Contents