a. Connect each power cord to the server.
b. Connect each power cord to the power source.
21. Power up the server.
22. If removed, install the security bezel.
23. If you plan to use the iLO Dedicated Network Port, use the iLO web interface to enable this port.
For more information, see the Enabling the iLO Dedicated Network Port through the iLO web interface section in the
iLO user guide on the Hewlett Packard Enterprise website.
The installation is complete.

Installing the serial port cable

Prerequisites
Before you perform this procedure, make sure that:
The M.2 SSD/dedicated iLO/serial port enablement board is installed.
5 mm hex nut screwdriver is available.
Procedure
1.
If installed, remove the security bezel.
2.
Power down the server.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
Remove the access panel.
7.
Remove the riser cage.
8.
Remove the serial port blank.