Deutschmann Automation GmbH & Co. KG
Attention:
The DeviceNet address set must correspond to the planned address!
All users in the DeviceNet have to use the same Baud rate!
These values are read in only on power-up of the gateway!
16.7 DeviceNet™ connection
Connect the device to the DeviceNet at the interface labelled "DeviceNet".
16.8 Connection to the process device
Please also read the manual for the process device when commissioning the process device.
16.9 Connecting the supply voltage
Please connect 10..33 DC voltage to the terminals provided for this.
16.10 Shield connection
Earth the top-hat rail onto which the module has been snapped.
16.11 Project planning
Use any project planning tool for project planning.
If the required EDS file was not supplied with your project planning tool, you can find a sample
file in chapter 14.2 or on the Internet at www.deutschmann.de.
29.6.20
UNIGATE
®
fieldbus gateway UNIGATE
Commissioning guide
®
CL - DeviceNet
V. 2.8
™
57
Need help?
Do you have a question about the UNIGATE CL - DeviceNet and is the answer not in the manual?