6. Disconnect the test leads from 715 Calibrator and turn the green key off.
The 715 verification test is complete.
717 Verification
Pressure Verification
1. Carefully attach the pressure fitting of the deadweight tester to the pressure port of
The display should read 0.00 PSI with the deadweight tester opened up to ambient air. If
2. Set up the deadweight tester for the sequence of PSI inputs from Table 62 to be
3. Ensure the pressure has stabilized at each input before verifying the display reading.
40
sales@GlobalTestSupply.com
Table 61. 715 DC Voltage Measure Verification (0.0000 mV to 200.0000 mV)
Fluke 5520A
0.0000 mV
50.0000 mV
150.0000 mV
the 717 30G Calibrator.
Use Plenty of TEFLON tape when attaching pressure fitting.
not, push the
key until display reads 0.00 PSI.
injected into the pressure port of the 717 Calibrator.
Fluke-Direct
Fluke 715
-0.02 mV to + 0.02 mV
49.98 mV to 50.02 mV
149.96 mV to 150.04 mV