Champion E Series Installation/Operation With Service Replacement Parts page 33

Rack conveyor dishwashers
Table of Contents

Advertisement

Maintenance
Maintenance
Weekly
1. Inspect all water lines for leaks and tighten at joints if required.
2. Clean any detergent residue from the exterior of the machine.
3. Check the drain operation.
4. Clean any accumulated scale from the heating element.
5. Inspect the spray arms for any damage or missing parts.
6. Inspect the final rinse arms for missing parts.
7. Inspect the drive assembly and cradle for damaged or missing parts.
8. Check that float switches move freely.
9. Check the idle pump actuator and the final rinse actuator for freedom of travel.
Monthly
1. Inspect interior of machine for lime deposits and clean.
2. Check o-rings on spray arm piping connections.
3. Check the drain operation.
4. Clean any accumulated scale from the heating element.
5. Inspect the spray arms O-rings and ensure all plugs are installed.
6. Inspect the final rinse arms for missing parts and are clean.
7. Inspect the drive assembly and cradle for damaged or missing parts.
8. Check that float switches move freely.
9. Check the idle pump actuator and the final rinse actuator for freedom of travel.
10. Check the drive belt and adjust as necessary.
11. Check the pump rotation and direction of rotation.
12. Check the operation of temperature gauges or displays.
13. Perform complete operation check.
Yearly
1. Contact authorized service agent to perform complete maintenance review of machine.
2. Correct any abnormal situations as recommended.
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents