Checks During And After The Fi Rst Commissioning; Gas Conversion; Combustion Check - Riello Family KIS Series Installer And User Manual

Table of Contents

Advertisement

Available languages

Available languages

Once activated, the function takes priority, if the machine is shut down by
disconnecting the power supply, when it is restarted the function picks up
from where it was interrupted.
The function can be interrupted before its end by putting the machine in
a condition other than OFF or else by selecting DEACTIVATE FUNCTION
from the relative menu.
Note: The temperature and increase values can be set to different values
only by qualified personnel, only if strictly necessary. The manufacturer
declines all responsibility if the parameters are incorrectly set.
DAY
TIME
1
2
3
4
5
6
7
5.11 Checks during and after the fi rst commissioning
After starting up, check that the boiler carries out the start-up procedures
and subsequent shut-down properly.
Check the domestic hot water operation by opening a hot water tap in
SUMMER mode or WINTER mode.
Check the full stop of the boiler by turning off the system's main switch.
After a couple of minutes of continuous operation to be obtained by turning
the system's main switch to "on", setting the boiler mode selector to
Summer and by keeping open the domestic hot water device, the binders
and manufacturing waste evaporate and it will be possible to carry out:
- checking the combustion.
HOT WATER ONLY
HEATING AND HOT WATER

5.12 Gas conversion

Conversion from a family gas to other family gas can be performed easily
also when the boiler is installed.
This operation must be carried out by professionally qualifi ed personnel.
The boiler is delivered to operate with methane gas (G20):
To convert the boiler to propane gas (G31)proceed as follows
- access the technical parameters as explained in the section" Accessing
the technical parameters".
- set the SERVICE password
- in the TECHNICAL menu select COMBUSTION CONTROL with the "UP"
and "DOWN" keys , confirming the selection
AIR PURGING CYCLE
EXHAUST PROBE RESET
ERROR HISTORY
COMBUSTION MONITORING
SERVICE
TEMPERATURE
0
20°C
6
22°C
12
24°C
18
26°C
0
28°C
12
30°C
0
32°C
0
35°C
0
35°C
0
30°C
0
25°C
BOILER
OFF
TECHNICAL
PARAMETERS
- Select type of gas
COMBUSTION MONITORING
COMBUSTION OFFSET
SERVICE
- Select LPG
SERVICE
The boiler needs no further adjustment.
b
The conversion must be carried out by qualifi ed personnel.
b
After the conversion has been carried out, apply the new
identifi cation label contained in the documentation envelope.

5.13 Combustion check

To carry out the combustion analysis, proceed as follows:
- power the boiler electrically by setting the main system switch to "ON"
- set the status of the boiler to OFF
- access the technical parameters as explained in the section" Accessing
the technical parameters".
- select CHIMNEY SWEEPING with the "UP" and "DOWN" keys,
confirming the selection
WEATHER COMPENSATION
RANGE RATED
CALIBRATION
COMBUSTION ANALYSIS
INSTALLER
GAS TYPE
BOILER TYPE
GAS TYPE
NATURAL GAS
LPG
TECHNICAL
PARAMETERS
ENGLISH
23