When you install the machine box at the open cabinet, prevent the frame of the
cabinet from blocking the airway of the machine box.
Ensure that nice ventilation is provided for the devices installed at the bottom of
the cabinet.
The clapboard separates exhaust gas and inflow air, and boost cool air to flow in
the machine box. The best location of the clapboard is decided by the air flow
mode in the machine box, which can be obtained through different location tests.
2.3.4 Power Requirements
Make sure that the power supply has nice grounding and the power at the input side of
the switch is reliable. The voltage control can be installed if necessary. At least a 240 V,
10A fuse or a breaker is provided in the phase line if you prepare the short-circuit
prevention measures for a building.
Caution:
If the power supply system does not have good grounding, or the input power disturbs
too much and excessive pulses exist, the error code rate of communication devices
increases and even the hardware system will be damaged.
2.4 Installation Tools and Device
The tools and devices to install the S2928 switch are not provided by the S2928 switch.
You yourself need to prepare them. The following are the tools and devices needed for
the typical installation of the S2928 switch:
Screwdriver
Static armguard
Bolt
Ethernet cable
Other Ethernet terminal devices
Control terminal
S2928 Hardware Installation Manual
- 8 -
Need help?
Do you have a question about the S2928 and is the answer not in the manual?