Bdcom S2928 Hardware Installation Manual page 5

Table of Contents

Advertisement

2
PWR
CONSO
3
LE
Link/AC
4
T
5
TE1-TE4
6
1-24
7
21-24
Additionally, S2928 has a grounding column, a socket and a power on-off at its back.
Figure 1-2 Back template of the S2928 switch
Table 1-3 Parts at the back template of the S2928 switch
No.
Abbrev.
/
1
/
2
/
3
Power indicator
Console port
Port indicator
4 10G SFP+ ports
24 1000Base-T ports
4 gigabit SFP ports
Name
AC power socket
Grounding
column
AC power on-off
S2928 Hardware Installation Manual
works normally.
If the switch is powered on, the
indicator is on.
Manages the switch locally.
If the indicator is always on, it
means that the connection is
linked.
If it flickers, the data is being
forwarded.
Forwards the 10000M Ethernet
optical signals
Forwards
the
Ethernet electric signals
Note: 21-24 are combo ports
Forwards the 1000M Ethernet
optical signals
Description
AC100~240V
The grounding must be fine.
Pressing upwards is to power on.
Pressing downwards is to power off.
10M/100/1000M
- 2 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S2928 and is the answer not in the manual?

Table of Contents