Pfe3 Filter Unit: Gas Connection - ABB ACX Commissioning Instruction

Advanced cga solutions, analyzer system for emission monitoring, cement applications and process measurement
Table of Contents

Advertisement

PFE3 Filter Unit: Gas Connection

Figure 7
PFE3 Filter Unit:
Gas Connections (with
Back-Purging)
(Dimensions in mm)
32
1
Tube Test Gas, VA 1.4571, 6x1 mm
2
Tube Compressed Air, CU, 15x1 mm
3
Terminal Box -X1 IP66
4
2 x M12x1.5 Cable Connectors
5
3 x M20x1.5 Cable Connectors
6
2 x M20x1.5 Cable Connectors
7
Tube Compressed Air, CU, 15x1 mm
A Test Gas Connection with Check Valve, Bulkhead Fitting 6 mm
B Back-purging of Filter (max. 6 bar), Bulkhead Fitting 18 mm
C Back-purging of Filter Surface / Probe Tube (max. 6 bar), Bulkhead Fitting 18 mm
D Sample gas connection, male fitting 6 mm
ACX Analyzer System Commissioning Instruction
CI/ACX-EN Rev. D