Observe the installation site requirements, see page 12
Observe the "Layout Plan" in the drawings set.
Mounting on a rack or wall. The loading capacity must be high enough to bear the
weight of the mounting plate and electrical distribution cabinet (see page 22).
Attachment with M8 bolts or studs.
ATTENTION!
The mounting plate weighs approx. 170 kg! The electrical distribution cabinet weighs
approx. 65 kg! A suitable lifting device (crane, block and tackle, lifting truck, etc.) is
required for transport, setting upright and installation!
It is strongly recommended that the mounting plate and the electrical distribution
cabinet are
transported by a specialist firm
transported in a horizontal position as far as possible and
not set upright until immediately before the installation!
The system components are shipped in two separate transport crates.
Open the transport crates and lift out the system components.
Do not remove the plastic foil in which the system components are shrink-
wrapped! Unpacking cold system components could cause condensation.
Do not remove the plastic foil until the system components have reached room
temperature. This takes at least 24 hours.
Installation site requirements, see page 12
Material required, see page 24
Follow the "Layout Plan" in the drawings set.
Hang the electrical distribution cabinet on the left of the mounting plate.
The distance is predetermined by the length of the prepared cables which are
connected to the modules on the mounting plate. The cables are tied together in
bundles for transport.
Connect the ground lead (green-yellow, ≥ 10 mm
terminal screw of the mounting plate and pass it through the provided M16 screwed
cable gland to the ground-terminal screw in the electrical distribution cabinet.
Connect the prepared cables to the electrical distribution cabinet:
Open the sliding cable entry plate on the underside of the cabinet (knurled screws)
Insert the ready-made cables
Attach the cable connectors to the appropriate terminal strip as per the wiring
diagram and
Close the cable entry plate