ABB ACX Commissioning Instruction page 42

Advanced cga solutions, analyzer system for emission monitoring, cement applications and process measurement
Table of Contents

Advertisement

Program Sequence
PFE2
Digital output:
Valve:
Step Duration Function
1)
0
4 hrs
Measure
Back-purging
8)
1
10 sec
probe filter
Back-purging
9)
2
14 sec
probe tube
3
6 sec
Venting
2)
4
150 sec
Post-purging closed
1)
0
4 hrs
Measure
PFE3, Probe 2,
Probe F, Probe
Digital output:
Tube 40W
Valve:
Step Duration Function
1)
0
4 hrs
Measure
1
2 sec
Switch over
Back-purging
3)
2
4 sec
probe filter
Back-purging
4)
3
8 sec
probe tube
4
6 sec
Venting
2)
5
150 sec
Post-purging
1)
0
4 hrs
Measure
1) Cycle time factory-set to 4 hours
2) Post-purging time factory-set to 150 sec. For an analyzer system with Probe F,
this period must be as short as possible (to be determined during start-up)
3) 1x pressure impulse 2 sec, 1x interrupt 2 sec
4) 1x pressure impulse 2 sec, 1x interrupt 2 sec, 1x pressure impulse 4 sec
5) Calibration valve on = "Measure", calibration valve off = "Calibrate"
6) Only in version with VOC analyzer AO2000-Fidas24:
open = sample gas path open, closed = relaxation against atmosphere
7) not in a system with Probe 2, Probe F
8) 3x interrupt 2 sec, 2x pressure impulse 2 sec
9) 3x interrupt 2 sec, 2x pressure impulse 2 sec, 1x pressure impulse 4 sec
42
-D08
-D08
-D08
DO2
DO3
DO1
-Y1.1
-Y2.1
-Y3.1
Impulse
Filter
Tube
Compr.
Back-
Back-
Air
purging
purging Venting
closed
closed
closed
Impulse open
closed
Impulse closed
open
closed
open
closed
closed
closed
closed
closed
closed
-A01
-A01
DO1
DO2
7)
-Y12
-Y11
Filter
Tube
Back-
Back-
purging
purging Venting
closed
closed
closed
closed
open
closed
closed
open
closed
closed
closed
closed
closed
closed
ACX Analyzer System Commissioning Instruction
-D08
-D08
-E05
DO4
DO5
MV1
6)
-Y4
-Y5
-Y01
Sample
Position
Gas
Calibr.
Valve
Valve
open
open
Measure off
closed
closed
Calibrate on
closed
closed
Calibrate on
open
closed
Calibrate on
open
open
Measure on
open
open
Measure off
-A01
-E05
DO3
MV1
-Y07
-Y01
Position
Calibr.
Valve
closed
Measure off
closed
Calibrate on
closed
Calibrate on
closed
Calibrate on
open
Calibrate on
closed
Measure on
closed
Measure off
Status
Display
signal
Message
"Purge
back
Maint.
5)
active"
Mode
off
on
on
on
on
off
Status
Display
signal
Message
"Purge
back
Maint.
5)
active"
Mode
off
on
on
on
on
on
off
Continued on next page
CI/ACX-EN Rev. D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents