ABB ACX Commissioning Instruction page 21

Advanced cga solutions, analyzer system for emission monitoring, cement applications and process measurement
Table of Contents

Advertisement

Power Supply Requirements,
Fuses
CI/ACX-EN Rev. D
continued
-F10
Power supply / leakage current indicator (option)
-F20
Power supply UPS / leakage current indicator (option)
-F01
Lighting, service socket, ventilation fan or cooling unit
-F02
Heated probe tube, heated filter unit, back-purging unit, test
gas connection valves
-F03
Heated sample gas line
-F04
NO
/ NO converter
2
-F05
AO2000-Fidas24, air catalyst
-F06
Sample gas cooler, sample gas feed unit
-F07
AO2000 central unit, power supply
-F11
Temperature controller
-F12
Temperature controller
-F13
Temperature controller
-F14
Emergency purging AO2000-Fidas24
-F17
Test gas valve 1
-F18
Test gas valve 2
-F19
Test gas valve 3
-F22
Filter unit 2nd sampling point
-F23
Heated sample gas line 2nd sampling point
ACX Analyzer System Commissioning Instruction
25 A / 30 mA
25 A / 30 mA
6 A or 16 A
10 A or 16 A
or 6 A
16 A
6 A
6 A
6 A
6 A
T 2 A
T 2 A
T 2 A
T 0.5 A
T 0,5 A
T 0,5 A
T 0,5 A
10 A or 16 A
16 A
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents