Materials Needed for Installation (not supplied)
Gas Sampling
Gas Lines
Input Wiring
Signal Leads
Mounting
24
•
Wall tube with mounting flange (DN 65, PN 6, Type A to DIN EN 1092-1, see Figure 1,
page 15)
•
Sample gas (unheated line)
•
Sample gas outlet
•
Test gas N
2
•
Test gases 1, 2, 3
•
Instrument air
•
Fidas24 combustion air
•
Fidas24 combustion gas
•
Fidas24 zero gas
•
Fidas24 span gas
•
Fidas24 exhaust gas
•
Condensate collecting bottle
•
Input wiring
•
2
5 x 6 mm
(5 x AWG 8)
•
If applicable, uninterruptible power supply wiring 3 x 2.5 mm
•
Cables to connect the heated gas sampling probe, filter and sample gas line to the
analyzer cabinet (if applicable, in a heat-resistant version; note the power
requirements of these components, page 20)
•
Grounding cable with cross section ≥ 10 mm
•
Shielded cable for analog outputs (current outputs)
•
Cable for digital outputs
•
Cable for data lines (Modbus, Profibus, Ethernet)
•
Cable for the Pt100 resistance thermometers of the heated components
When selecting conductor materials, follow all applicable national safety regulations
for the installation and operation of electrical devices.
•
Screws and nuts to secure the analyzer cabinet to the floor
or
•
Screws and nuts (stud bolts if applicable) to secure the mounting plate and the
electrical distribution cabinet to the wall
For details regarding the size of the screws and nuts see the "Layout Plan" in the
drawings set.
ACX Analyzer System Commissioning Instruction
PTFE pipe 4 / 6x1 mm
PTFE pipe 4 / 6x1 mm
PTFE pipe 4 / 6x1 mm
PTFE pipe 4 / 6x1 mm
Stainless steel pipe, 8 mm O.D., or compressed-air
hose (plus pressure gauge and shut-off valve)
PTFE pipe 4 / 6x1 mm
Purified stainless steel pipe (SS316), 6 mm O.D.
PTFE pipe 4 / 6x1 mm
PTFE pipe 4 / 6x1 mm
Stainless steel pipe, 12 mm O.D.
PVC tube 4 / 6x1 mm
2
(≥ AWG 8)
2
(3 x AWG 14)
CI/ACX-EN Rev. D