Figure 28. Media Isolated Mag Plus Probe Installation Example; Figure 29. Rain Shield Installed Position - Veeder-Root TLS-3 Series Site Prep And Installation Manual

Hide thumbs Also See for TLS-3 Series:
Table of Contents

Advertisement

Mag Probe Installation
Probe cable
Warning tag
*NOTE: to ensure that
the probe/tube kit can
be installed, the Mag
probe length and the
LPG-ISO probe kit
length should be at least
6 inches longer than the
tank's inside diameter.
Mag probe float
(outside tube)
Float retaining ring
(end of tube)
Mag probe shaft*
(inside tube)
Rain shield
Tank
bottom
Probe shaft
Rain shield
(Cutaway)
probe\lpgrnshield.eps
Entering Custom Float Size (In-Tank Setup - Ver. 22 or later)
Connector
Mag probe canister
Male connector 7/8" tube to 1" NPTF
Bushing, Stainless Steel
1" NPT x 1.5" NPT or 1" NPT x 2" NPT
Tank
7/8" OD stainless steel tube
with welded stainless plug
(Mag probe shaft lowered into tube)
1" clearance to
allow for expansion

Figure 28. Media Isolated Mag Plus Probe Installation Example

Top of tube
37
3.25" Approximate lowest
product level measured
by probe
probes/tubelpginst.eps

Figure 29. Rain Shield Installed Position.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tls-300 seriesTls-350 seriesGilbarco emc seriesGilbarco emc basic seriesProplus seriesPromax series

Table of Contents