Sign In
Upload
Manuals
Brands
Veeder-Root Manuals
Music Mixer
TLS-HLD
Veeder-Root TLS-HLD Manuals
Manuals and User Guides for Veeder-Root TLS-HLD. We have
1
Veeder-Root TLS-HLD manual available for free PDF download: Manual
Veeder-Root TLS-HLD Manual (62 pages)
Site Prep Manual
Brand:
Veeder-Root
| Category:
Music Mixer
| Size: 2 MB
Table of Contents
Introduction
3
Table of Contents
3
Regulatory Agency Console Documentation
6
Related Manuals
6
Safety Symbols
7
Site Considerations
8
Control Drawing
8
Figure 1. Control Drawing - Example TLS-HLD System Site Layout
8
National Electrical Code Compliance
9
Probe- To-Console Wiring
9
Probe Junction Boxes
9
Probe Wiring Safety Issues
10
Selecting a Console Location
10
Console Installation
12
Mounting the Console
12
Figure 2. Recommended Mounting of Console
12
Figure 3. Console Dimensions and Designated Conduit Knockouts
13
Wiring the Console
14
Figure 4. Wiring AC Power to the Console
14
Mag Probe Assembly
15
Attaching Probe Canister Spacer Rings
15
Assembling Floats Onto Probe Shaft
15
Attaching Cable Connector to Probe Canister
15
Figure 5. Installing Probe Canister Spacer Rings
16
Figure 6. Probe Float/Boot Installation
17
Probe Installation
18
Probe Manhole Installation
18
Figure 7. TLS-HLD Probe Installation Example - Underground Storage Tank
18
Probe Conduit Installation
19
Figure 8. TLS-HLD Probe Installation Example - above Ground Storage Tank
19
Wiring Run Methods
20
Buried Rigid Conduit
20
Pulling Wires for Probes
20
Direct Burial Cable
20
Figure 9. Example Probe Wiring Run in Buried Rigid Conduit
20
Figure 10. Example Probe Wiring Run Via Direct Burial Cable
21
Sealing Field Connections
22
Wiring Run through Rigid Conduit
22
Direct Burial Cable
22
Figure 11. Probe Field Wiring Connection
22
Connecting Probes to the Console
23
Figure 12. Epoxy Sealing Connections
23
Probe Wiring Precautions
24
Input/Output Wiring Positions and Labeling
24
Connecting Probes to the Console - Observe Polarity
24
Figure 13. Probe Installation Directory
24
Figure 14. Connecting Probe Wiring to Console
25
Applying Power to System
26
TLS-HLD Cold Boot - Initial Power up
26
TLS-HLD Cold Boot - RAM Clear
26
TLS-HLD Warm Boot
26
RS-232 Communications
27
RS-232 Peripheral Equipment Requirements
27
RS-232 Connections
27
To a Device Less than 50 Feet from the Console
27
To a Device more than 50 Feet from the Console
27
Surge Protection for Communication Devices
28
Figure 15. Console Connected to a Remote Device Via Short-Haul Modem
28
Restricting System Programming Access
29
Serial Security
29
Setup Security
29
Dip Switch Settings
29
RS-232 Serial Communication Setup
29
Figure 16. Console Dip Switch Settings
29
DB-9 Connector Pin-Outs
30
Figure 17. DB9, RS-232 Pin-Outs
30
Rs-232 Commands
31
TLS-HLD RS-232 Serial Commands
31
Function Code: 001
32
System Reset
32
Function Code
33
Remote Alarm Reset
33
201 In-Tank Inventory Report
34
Function Code: 201
34
Function Code: 205
35
In-Tank Status Report
35
504 Set RS-232 Security Code
36
Function Code: 504
36
Function Code: 50C
37
Set Printer Page Eject Enable
37
517 Set Units of Measurement and Language (Ext. Lang. Set)
38
Function Code: 517
38
Function Code: 601
39
Set Tank Configuration
39
Function Code: 608
40
Set Tank Tilt
40
Function Code: 881
41
Set Communication Port Data
41
Function Code: 882
42
Initialize Communication Port Data
42
883 Set Communication Port Language
43
Function Code: 883
43
884 Set Serial Port Handshaking
44
Function Code: 884
44
Function Code: 902
45
System Revision Level Report
45
Function Code: A01
46
Probe Type and Serial Number
46
A02 Probe Calibration Values
47
Function Code: A02
47
Function Code: A10
48
Probe Last Sample Buffers
48
A11 Probe Fast Average Buffers
49
Function Code: A11
49
A12 Probe Standard Average Buffers
50
Function Code: A12
50
Troubleshooting
51
Dual-Function Front Panel Keys
51
Probe Diagnostic Menu
51
Figure 18. Dual-Function Keys
51
Probe Diagnostic Report
53
Replacing the CPU Board
53
Figure 19. CPU Board Voltage Test Points
54
PROM Chip Replacement (Software Upgrade)
55
Figure 20. Removing PROM Chip
56
Figure 21. Replacing PROM Chip
57
Replacing the Power Supply Board
58
Display Messages
58
Tank Parameters
58
Alarms
58
Alarm Cause/Action Table
59
Console Specifications
60
Physical Specifications
60
Environmental Specifications
60
Electrical Specifications
60
Signal Input Specifications
60
Signal Output Specifications
60
Front Panel User Interface
60
TLS-HLD Probe Circuit Codes
61
Advertisement
Advertisement
Related Products
Veeder-Root TLS-450PLUS
Veeder-Root TLS-4 Series
Veeder-Root TLS2
Veeder-Root TLS-450
Veeder-Root TLS-450 PLUS
Veeder-Root TLS-350l
Veeder-Root TLS-300
Veeder-Root TLS-3 Series
Veeder-Root TLS-IB
Veeder-Root TLS-350 Series
Veeder-Root Categories
Measuring Instruments
Music Mixer
Water Pump
Control Unit
Accessories
More Veeder-Root Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL