STEP 1: HARDWARE
STEP 3: LIFT NEW BLOWER IN SAME MANNER
AS THE OLD WAS REMOVED
4-16
VSRT_IOM_2018-1213
A.) HOOK A CHAIN THROUGH LIFTING EYE
TO LIFT BLOWER (EST. WEIGHT: 125 LBS.)
B.) UNSCREW ALL (4) BOLTS
MOUNT HOOKS
STEP 5: REINSTALL HARDWARE
STEP 2: SWING OUT AND LIFT
STEP 4: LOWER BLOWER INTO HOOKS
TORQUE TO 23 FT-LBS
(TYP. 2 PLCS.)
TORQUE TO 23 FT-LBS
(TYP. 2 PLCS.)