FULTON VSRT Series Installation And Operation Manual page 66

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

4 - MAINTENANCE & TROUBLESHOOTING
Figure 21 - Inspect hand holes for scale or sludge buildup
19. Fit the hand hole assembly as follows:
» Place the gasket on the hand hole plate and
ensure that it is seating correctly. Do not use
any grease, lubricant, or adhesive.
Figure 22 - Removing Hand Assembly with Tee Handle
» Position the plate in the boiler. Set the yoke
and tighten the securing nut sufficiently
enough to provide a snug fit. Verify the
position of the plate in the boiler, then make
it hand tight and then snug with wrench
about 1/4 turn. Do not compress excessively.
See Figures 23 and 24.
» Refill the boiler with fresh water.
4-6
VSRT_IOM_2018-1213
Wrench
! CAUTION
If the gasket leaks while pressure is being built up,
tighten only enough to stop leakage. Never tighten
more than necessary to prevent leakage. Excessive
tightening may shorten the life of the gasket.
Figure 23 - Correct pressure on gasket
Figure 24 - Overcompressed Gasket
Inspect the burner and wipe off and/or use low pressure
air (do not scrub or use wire brush) to remove any soot
or foreign material that may have accumulated.
If there is evidence of deterioration or corrosion, replace
immediately. Refer to procedure entitled Inspection/
Cleaning of the Burner Assembly at the end of this
section for cleaning and burner removal procedures.
The burner must be removed to perform a thorough
inspection and cleaning.
© Fulton 2018

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsrt 10Vsrt 15Vsrt 20Vsrt 30Vsrt 40Vsrt 50 ... Show all

Table of Contents