FULTON VSRT Series Installation And Operation Manual page 14

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

2 - INSTALLATION
NOTES for Table 3- VSRT Specifications (from previous page)
1. Steam output LB/HR: From 0 PSIG at 212°F (0 kg/cm² at 100°C).
2. All clearances are factory recommendations. Consult local jurisdiction for exact code compliance.
3. Fulton recommends minimum clearance of 36" in front of electrical panels.
4. Fulton recommends 36" clearance between inspection openings of all boilers, 18" clearance of handholes, and 18" from exhaust stack.
5. All dimensions inside ( ) denote reference dimensions.
6. All dimensions inside rectangles denote overall dimensions.
7. We reserve the right to change specifications and/or dimensions. All information is subject to change based on addition of any op-
tional equipment and/or accessories. please consult the factory for project specific estimates if additional options or accessories are
required.
8. Refer to fuel train drawing for fuel train venting requirements. Recommended stack run is minimum 24" straight off the rear of the
boiler, prior to making a directional change.
9. Local codes can supercede Fulton recommended clearance.
98 1/2
CLEARANCE REQUIRED
FOR BURNER REMOVAL
(74)*
(STEAM OUTLET)
-
INITIAL RELEASE
REV
REVISION DESCRIPTION
2-4
VSRT_IOM_2018-1213
73 5/8
(FUEL INLET)
41 3/8
(AIR INLET)
Figure 1 - 10/15-HP Model VSRT Dimensions - Front
-
Side View (All dimensions in inches)
B.O.M.
REVISION HISTORY
FRONT VIEW
-
-
-
ELEC. ENG. MECH. ENG
CHECKED
7 1/16
P
22 7/8
K
H
J
(MIN HEIGHT)
G
N
UNLESS OTHERWISE NOTED
This design and drawings are
DIMENSIONS ARE IN INCHES
proprietary and are the
TOLERANCES
exclusive property of The
FRACTION &
1/8
-
WHOLE VALUE
Fulton Companies. The
(1) PLACE DEC.
0.03
corporation does not permit
(2) PLACE DEC.
0.015
(3) PLACE DEC.
0.005
their use except with prior
ANGLE
0.5 DEG
written consent.
SURFACE FINISH
APPROVED
250 MICRO-INCHES
SEE
NOTE
9
SEE NOTES 3 AND
70
The items shown in this
DRAWN BY:
T. KENNE
drawing may be covered by
one or more patents of The
Fulton Companies.
CHECKED BY:
N/A
B.O.M. REVIEW
N/A
© Fulton 2018
THIRD ANGLE PROJECTION