FULTON VSRT Series Installation And Operation Manual page 22

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

2 - INSTALLATION
7 1/8
24 1/8
Note 3: Fulton recommends a minimum clearance of 36" in front of the electrical panels.
Note 4: Fulton recommends 36" clearance between openings of all boilers, 18" clearance of handholes, and 18" from exhaust stack.
Note 11: Local codes supercede Fulton recommended clearances.
2-12
VSRT_IOM_2018-1213
P
F
Figure 9 - 30-HP Model VSRT Dimensions - Top
UNLESS OTHERWISE NOTED
This design and drawings
The items shown in this
DIMENSIONS ARE IN INCHES
are proprietary and are the
TOLERANCES
drawing may be covered by
exclusive property of
FRACTION &
1/8
one or more patents of
WHOLE VALUE
Fulton Group N.A., Inc.
Fulton Group N.A., Inc.
(1) PLACE DEC.
0.03
The corporation does not
(2) PLACE DEC.
0.015
(3) PLACE DEC.
0.005
permit their use except
ANGLE
0.5 DEG
with prior written consent.
SURFACE FINISH
250 MICRO-INCHES
59 7/8
32 1/2 (MINIMUM WIDTH)
7 1/8
SEE
NOTE
4
SEE NOTES 3 AND 11
View (All dimensions in inches)
DRAWN BY:
T. KENNEDY
CHECKED BY:
J.B.
B.O.M. REVIEW
THIRD ANGLE PROJECTION
N/A
2 OF 2
E
C
62
MECH. ENG:
2/16/2017
W.W.
2/24/2017
ELEC. ENG:
2/24/2017
N/A
APPROVED BY:
E.B.W.
2/24/2017
JOB NUMBER:
PROJECT NAME:
© Fulton 2018
PROJECT MANAGER:

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsrt 10Vsrt 15Vsrt 20Vsrt 30Vsrt 40Vsrt 50 ... Show all

Table of Contents