FULTON VSRT Series Installation And Operation Manual page 24

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

C
2 - INSTALLATION
84 1/4
MECHANICAL REVIEW:
2/14/2018
W.W.
ELECTRICAL REVIEW:
N/A
APPROVED BY:
E.B.W.
2-14
VSRT_IOM_2018-1213
RIGHT SIDE VIEW
JOB NUMBER:
2/16/2018
Figure 11 - 40/50/60-HP Model VSRT Dimensions -
PROJECT NAME:
Side View (All dimensions in inches)
PROJECT MANAGER:
2/16/2018
D
L
R
A
21 3/8
DESCRIPTION:
VSRT-60 GAS FIRED MODULATED STEAM BOILER
(150 PSI)
P
R
SECONDARY SAFETY RELIEF V
S
MAX ALLOWABLE WORKING PRESSURE:
BOILER INPUT:
BOILER INPUT: (NATURAL GAS)
BOILER OUTPUT:
STEAM OUTPUT/MIN. SRV CAPACITY:
NET EFFECTIVE HEATING SURFACE:
WATER CAPACITY (OPERATING):
APPROXIMATE DRY WEIGHT:
APPROXIMATE OPERATING WEIGHT:
APPROXIMATE SHIPPING WEIGHT:
APPROXIMATE FLOODED WEIGHT:
BURNER TURNDOWN:
MINIMUM DRAFT REQUIREMENT:
MINIMUM INCOMING GAS PRESSURE:
BURNER MOTOR WITH VFD:
NOTES:
1.
STEAM OUTPUT LB/HR: FROM
100°C)
2.
ALL CLEARANCES ARE FACTOR
LOCAL JURISDICTION FOR EX
3.
FULTON RECOMMENDS MINIM
OF ELECTRICAL PANELS.
4.
FULTON RECOMMENDS 36" CL
103 1/2
OPENINGS OF ALL BOILERS, 1
AND 14" FROM EXHAUST STA
99 3/16
5.
PLEASE REFER TO THE O&M M
INFORMATION REGARDING C
96 5/8
INSTRUCTIONS.
6.
ALL DIMENSIONS INSIDE ( ) D
ALL DIMENSIONS INSIDE  D
7.
64 5/8
8.
WE RESERVE THE RIGHT TO C
AND/OR DIMENSIONS. ALL IN
TO CHANGE BASED ON ADDIT
EQUIPMENT AND/OR ACCESSO
FACTORY FOR PROJECT SPEC
ADDITIONAL OPTIONS OR AC
9.
10.
11.
SHEET 1 OF 1
© Fulton 2018
COMBUSTION AIR IN
AUXILIARY WATER COLUM
EQUIPMENT SPECIFICAT
RECOMMEND STACK RUN IS
THE REAR OF THE BOILER, P
DIRECTIONAL CHANGE.
LOCAL CODES CAN SUPERCED
CLEARANCE.
*SIZE DEPENDS ON TRIM PR
F u
Fulton
DRAWING NUMBER
9-SR-060312 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsrt 10Vsrt 15Vsrt 20Vsrt 30Vsrt 40Vsrt 50 ... Show all

Table of Contents