Connecting Cables - Huawei SmartACU2000B Quick Manual

Smart array controller with no pid module, 800 v ac
Hide thumbs Also See for SmartACU2000B:
Table of Contents

Advertisement

5.1
Installing the POE Module
1. Loosen screws and remove the mounting
board. Do not remove the screws.
2. Remove screws from the POE module
installation position.
3. Secure the POE module. (The indicators
should be in the lower left corner.)
4. Secure the mounting board.
5.2
Installing the LAN Switch
1. Remove the panel
from the LAN switch
installation position.
2. Secure the LAN switch.
3. Connect the PE cable
for the LAN switch.
6

Connecting Cables

Connect cables in accordance with the installation laws and regulations of the country or region
where the project is located.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents