Installing The Au-Odu; Au-Odu Installation Requirements; Table 2-1: Au-Odu Types - Nera WiLink-I Series System Manual

Modular base station
Table of Contents

Advertisement

Chapter 2 - Installation Guidelines
2.1

Installing the AU-ODU

The following sections describe how to install the AU-ODU, including pole
mounting the ODU and connecting the cables.
2.1.1

AU-ODU Installation Requirements

2.1.1.1
AU-ODU Packing List
¢
ODU: Any of the following:
Item
WiLink-I-BST-AU-ODU-3.3d
WiLink-I-BST-AU-ODU-3.3e
WiLink-I-BST-AU-ODU-3.3f
WiLink-I-BST-AU-ODU-3.3g
WiLink-I-BST-AU-ODU-3.5a
WiLink-I-BST-AU-ODU-3.5b
WiLink-I-BST-AU-ODU-HP-3.5a
WiLink-I-BST-AU-ODU-HP-3.5b
WiLink-I-BST-AU-ODU-3.6a
WiLink-I-BST-AU-ODU-3.6b
Pole mounting kit
¢
2.1.1.2
Additional Installation Requirements
The following items are also required to install the ODU:
IF cable with two TNC connectors* (see
¢
types and length).
¢
Antenna* and RF cable* for connecting the antenna to the AU-ODU.
Grounding cable with an appropriate termination.
¢
24

Table 2-1: AU-ODU Types

Description
AU-ODU operating in the 3.3d band
AU-ODU operating in the 3.3e band
AU-ODU operating in the 3.3f band
AU-ODU operating in the 3.3g band
AU-ODU operating in the 3.5a band
AU-ODU operating in the 3.5b band
High Power AU-ODU operating in the 3.5a band
High Power AU-ODU operating in the 3.5b band
AU-ODU operating in the 3.6a band
AU-ODU operating in the 3.6b band
Section 2.1.3
for details on IF cable
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wilink-i 3000

Table of Contents