2.2.1 Mounting

1. Mount securely in correct orientation allowing minimum clearance – see diagram.
2. Route mains and low voltage output cables via different knockouts and/or cable entry holes.
3. Use bushes and cable glands rated to UL94 HB minimum.

2.2.2 Mains power up

1. Attach correctly rated mains cable (minimum 0.5mm
cable ties.
2. Apply mains power and:
l
l
3. Disconnect mains power.

2.2.3 Load Output

1. Attach correctly rated load cable and fasten using cable ties. Note polarity.
2. Apply mains power and check green Mains LED is on.
Note: Red LED may be illuminated (dependent upon model) to indicate that no battery has been
connected. This is normal.
3. Verify load is operating correctly.
4. Disconnect mains power.

2.2.4 Standby Battery

Note: Ensure batteries being fitted to this unit are in good condition
1. Connect battery leads to battery, ensuring correct polarity of battery connections. Vanderbilt
recommend using a 7Ah battery.
2. Apply mains power and check that the green Mains LED is on.
3. Check there is no fault indication on Red LED (dependent on model).
4. Disconnect mains power.
5. Check that the batteries continue to supply voltage and current to the load.
The Green LED should be off.
© Vanderbilt 2019
Check for 13.8V DC on load outputs.
Check green Mains LED is on.
2
[3A], 300/500V AC) and fasten using
11
Installation
A-100528-b
20.05.2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Act365-vcu2aAct365-vcupoe

Table of Contents